What shipped in 2026 (the first 5 months)
AI Search Visibility, voice-preserved import, configurable HRMS, performance leaderboard, multi-currency billing, and reminders with client-portal negotiation. The honest log.
Six months into 2026, here's the honest log of what shipped. I'm writing this as a counterweight to the marketing site — those pages describe what the product does; this post lists what actually rolled out and when.
Q1 2026
- •Phase B3.5: Multi-currency billing — USD/INR/CAD/EUR/GBP/AED with 48 Stripe Price IDs (Feb).
- •Phase B4: Annual plans with 2-months-free toggle on /pricing and /settings/billing (Feb).
- •Phase H: Voice-preserved import + AI-generated SEO footer + schema markup safety rails (March).
- •Phase F1–F4: Keyword Intelligence — DataForSEO enrichment, competitor gap, cannibalization detection, intent classification (March).
Q2 2026 (so far)
- •Phase E: Pages & Indexing — GSC sync, sitemap generator, auto-submit cron, IndexNow stubs (April).
- •Phase 31: Configurable HRMS — 8 sub-phases including config wizard, attendance, leave, shifts, OT, reports (April–May).
- •Phase 32: Workspace-context resolver + Phase 33 employment-status chrome (May).
- •Phase 36: Records — Notion-style typed tables with per-row revision history + 30-day trash (May).
- •Phase 37: Reminders — account-level + client-initiated with two-way date negotiation + multi-channel notifications (May).
- •Phase 38.1–38.3: Performance Leaderboard — scoring + 5-band dept board + 11 weekly champion/achievement badges (May).
What's parked (not shipped, don't believe marketing if it says otherwise)
These are spec'd but not built. If you see them claimed as live anywhere, that's a bug, please tell us:
- •Phase 28 Autopilot — Claude-as-operator agent that runs SEO tasks autonomously. Spec locked. Build pending.
- •Phase G Local SEO — GBP sync, Maps grid rank, citations, review monitor. Locked roadmap, not built.
- •Phase F5+ — extended keyword intelligence (SERP feature predictions, intent-aware bidding). Roadmap only.
- •Slack integration — on the roadmap. Email digests cover the gap today.
What's next
Phase 39 (Social Planner — migrate Postiz-style multi-platform posting into ItzSEO) is the big Q3 effort. Phase 28 Autopilot is queued behind that. Smaller polish phases — schema markup on marketing pages, OG image generation, a proper /changelog — land in between.
If there's a specific phase you want a deeper writeup on, email hello@itzseo.com and I'll write it next.